July 2011

Drywell install

Jul
04

So far, throughout the construction I approached each job with a 'this is going to be tough' attitude. And then it ends up being not so bad at all. The drywell tube installation was no exception.

Posted By David read more

Tee-Pee

Jul
04

We found that when we were digging, we got a lot more done when the sun wasn't beating down on us. Sometimes a cloudy day did the job, but when the clouds didn't show up for work, we had to take alternate measures. Enter the tee-pee.

Posted By David read more

Herculean feat

Jul
04

Finally done with all the digging! By the Gods am I happy that's over!

This past weekend we finally finished all the digging for the Sioux Studio foundation and dry well...one shovel at a time. The foundation was roughly 42 linear feet, 20" wide and 5' deep, and the dry well was 34" diameter at 7' deep. All dug by hand. Now there's a way to work off all that fat you stored up during winter.

Posted By David read more

Something from nothing

Jul
01

Something from nothing. It seems like a reoccurring theme for me. And boy did I find a gem this time.

Posted By David read more

The Sioux Cob Studio

Jul
01

Time to get down to the nitty-gritty and get some good experience in building with cob.

Posted By David read more